G General

Rock Stone Stage UpDated Boxed

Rock Stone Stage UpDated  Boxed
Details
Features
Contents
Reviews

There is a few things that are a must after you rez this stage.
1. you must reset scripts in the stage floor and DJ booth for the floor to move up and down correctly. It has something to do with the script.
When you de rez the stage the dj booth and floor lift prim will still be there.. because we re set the scripts after rezing and it's because we re set the rez script. This is very simple to do, if i knew how to correct i would.:).
So just take the floor and DJ booth and delete it. there is always a copy in the rez box.

Just make sure you re set the scripts in the Stage Floor, Dj Booth, This stage is complete 128 prims after you remove the rez box.
My suggestion is this,,leave the rez box and cover it with something till your show is over :)
Again..always re set scripts in the prim i mentioned above after the stage has fully rezzed.
This Stage is 48 M deep, 35 M wide and 10.5 M tall
Copy/mod(except the scripts) No Transfer.
Any Issues you may come across..feel free to contact me. Read the Note card before rezing
Again I do thank you

Victoria1980

I have been asked a lot of times why i sell my builds so cheap.
I do it because i love what i do, Land prices keep going up. So why should you pay a lot for a home. My homes are of good quality. I cringe on texture flickers. I always go over and over and over again on my builds to assure there are none. But i don't have control of sl roll overs or the way things are rezzed.
All i can say is i try my very best to give the best product i can.