G General

SUBWAY station 2022. small version 81 Land Impact. Version 1

SUBWAY station 2022. small version 81 Land Impact.
Details
Features
Contents
Reviews

A smaller version of the subway station build, ideal for urban city or special rural builds.
81 land impact
21m by 40m footprintAlso contains open ended version.

  • 21m by 40m footprint
  • 81 land impact
  • subway station with 2 slim platforms- seating, snacks
  • double rail track standard width
  • turnstyle hall with change dispensor